URGENT REPAIRING, OVERHAULING AND PAINTING OF PUMPS (INCLUDING SUPPLY OF SPARES) AT DIFFERENT STRATEGIC LOCATIONS UNDER HALDIA WATER SUPPLY PROJECT.(NIT-8 2nd call) |
|
URGENT SUPPLY AND INSTALLATION OF VALVES AT DEFFERENT LOCATIONS UNDER HALDIA WATER SUPPLY PROJECT.(NIT-7) |
|
URGENT REPAIRING, OVERHAULING AND PAINTING OF PUMPS (INCLUDING SUPPLY OF SPARES) AT DIFFERENT STRATEGIC LOCATIONS UNDER HALDIA WATER SUPPLY PROJECT.(NIT-8) |
|
Engagement of consultant for preparation of Detail Project Report which include inlet Water analysis, soil investigations , route survey for RO units, reservoirs, pump house, distribution network etc, feasibility study of the project, GA drawing of the proposed system, construction drawings for network, preparation of technical specifications, standards and detailed estimate of RO plant along with distribution network , pump house and reservoirs, supply, and installation cost estimate of RO plants which by producing water and by proper blending with the surface treated water , shall be sufficient for supplying standard potable quality water to the target consumers , estimates of RO-operation and maintenance cost /year, cost impact on existing water tariff for domestic and municipal consumers to make the project viable and sustainable, vetting of these cost estimates from PHED/MED/PWD, Govt. of West Bengal and reviewing detail drawing , design and specification/standard submitted by the executing agency/contractor during execution, Preparation of tender documents for selection of executing agency, Preparation of draft Contract Agreement.(EOI-1 2nd call) |
|
Water supply reconnection to Shri Nirapada Nayak, Hotel-cum-Restaurant, IOCL Gate No.-1, Haldia, Requiremant -2 KLD, Category-Commercial.(NIQ-2) |
|
Up gradation of water supply connection to Central Institute of Plastics Engineering & Technology (CIPET), Haldia, Requiremant -60 KLD, Category-Domestic(NIQ-1) |
|
Corrigendum on EOI-01/HDA/EC(MECH) OF 2016-17 |
|
Corrigendum-I on NIT-01/HDA/EX(MECH) OF 2016-17 |
|
Engagement of consultant for preparation of detail project report which include feasibility report , detail design, drawing, preparation of technical specifications and standards , supply, and installation cost estimates of Reverse Osmosis plants along with cost estimates for distribution network , pump house and reservoirs for producing water which by proper blending with the surface treated water shall be sufficient to cater the combined domestic and municipal demand of 6 MGD as per given quality standard to the target consumers, estimates of RO-operation and maintenance cost /year, cost impact on existing water tariff for domestic and municipal consumers, vetting of cost estimates from PHED/MED/PWD, Govt. of West Bengal, Preparation of tender documents for selection of executing agency, Preparation of draft Contract Agreement.(EOI-1) |
|
PROVIDING SECURITY SERVICE COVERING ALL ASSETS OF NEW WTP AT GEONKHALI BY DEPLOYING ADEQUATE SECURITY GUARDS INCLUDING MONITORING AND SURVEILLANCE , CLEANING OF OUTSIDE AREA OF PLANT, PUMP HOUSES, RESERVOIRS AND UTILITY BULIDINGS INCLUDING UPROOTING WILD VEGETATION WITHIN THE PROJECT PREMISES.(NIT-6) |
|