Dismantling, transportation, rewinding, re-installation and other necessary work of (1) One no 160 KW defective motor of Basudevpur Pumping Station (Phase-II), (1) One no 160 KW and (1) one no 45 KW defective motors installed at Basudevpur Pumping Station (Main).(NIT-9) |
|
ANNUAL MAINTENANCE OF AIR CONDITIONER MACHINES IN HDA.(NIT-10) |
|
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LED STREET LIGHTS AT BALAIPANDA AREA UNDER MAYNA BLOCK (APPROX 2.65 KMs).(NIT-8 2nd call) |
|
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LED STREET LIGHTS AT THEKUACHAK BAZAR, SASIGANG BAZAR, BOROJ BAZAR (APPROX 2.45 KM).(NIT-5 3rd call) |
|
Corrigendum on NIT-5 |
|
Urgent work of construction of Dias covered at top with backdrop, water proof temporary pandel, supply of table, chair, VIP table & chair, flower decoration, sound system and lighting system with Generator etc near Kolaghat Rail Bridge (Denan Bazar) for inauguration of LED Street Light at evening.(NIQ-4) |
|
Design, Supply, Installation, Testing and Commissioning of LED street lights at Thekuachak Bazar, Sasigang Bazar, Boroj Bazar (Approx 2.45 KM). (NIT-5) |
|
Supply and erection of poles, laying of cables and other electrical works for LED street lighting at Thekuachak Bazar, Sasigang Bazar, Boroj Bazar (Approx 2.45 KM). (Excluding the Supply, Installation, Testing & Commissioning of LED Street Light Fittings).(NIT-4) |
|
Internal Electrification of Nurshing Hostel in Tamluk District Hospital, Purba Medinipur.(NIT-6) |
|
Construction of Dias covered at top with backdrop, supply of table, chair, VIP table & chair, flower decoration, sound system and lighting system with Generator etc near Durgachak New Market for inauguration of LED Street Light from on 23rd June, 2015 at about 6.30 p.m.(NIQ-3) |
|