Corrigendum on 02/HDA/EC-ELECT/2017-2018 |
|
NIT No : 29/HDA/EC-ELECT/2016 – 2017(2nd Call)
Name of work : Dismantling, Transportation, Lifting of Core, Repairing, Assembling, Re-Transportation, Re-Installation on existing base, Connection with existing switchgears, Testing and Commissioning of One 4MVA 33KV/6.6KV Transformer with its accessories installed at Geonkhali new Water Treatment Plant (on turn-key basis). |
|
NIT No : 02/HDA/EC-ELECT/2017-2018
Name of work : Supply, Installation, Testing and Commissioning of 36KV 50 Hz Voltage Transformers 3 nos with accessories at Geonkhali Old Water Treatment Plant (on Turn-Key Basis).
|
|
NIT No : 01/HDA/EC-ELECT/2017-2018
Name of work : Design, Supply, Erection, Testing and Commissioning of Poles, LED Street Light Fitting and other Electrical Works for LED Street Lighting through G.I. Octagonal Pole at Teropakhia Bazar Area, Sub-Health Centre at Mangalchak Under Nandigram- II Block (Approx 1.8 Km.) |
|
NIT-36 |
|
HT& LT INTERNAL & EXTERNAL ELECTRICAL WORKS, DG SETS, HV-AC, FIRE PROTECTION SYSTEM, ELV, ELEVATOR INSTALLATION AT PROPOSED TRAUMA CENTRE, HALDIA.(NIT-19 3rd call)) |
|
NIT No :37/HDA/EC-ELECT/2016 – 2017
Name of work : Annual Operation, Surveillance, Maintenance against defect & lost/damage, etc. of Decorative Street Lighting System (Trident) Under Haldia Development Authority.
|
|
NIT No :35/HDA/EC-ELECT/2016 – 2017
Name of work : ANNUAL OPERATION, SURVEILLANCE, MAINTENANCE AGAINST DEFECT & LOST/DAMAGE, ETC. OF LED STREET LIGHTING SYSTEM (EXCLUDING LED STREET LIGHT FITTINGS) FROM A) SUPERIOR PETROL PUMP TO MAKHAN BABUR BAZAR, HELIPAD GROUND AND IN FRONT OF HALDIA BHAWAN, B) CIPET MORE TO NH-41 VIA HALDIA JAIL AND NANDIGRAM BY-PASS TO JAHURI MORE (ON TURNKEY BASIS).
|
|
ANNUAL OPERATION, SURVEILLANCE, MAINTENANCE AGAINST DEFECT & LOST/DAMAGE, ETC. OF LED STREET LIGHTING SYSTEM AT SIX NUMBER DIFFERENT IMPORTANT MARKET AREAS UNDER HDA(EXCEPT LED LIGHT SETS) (TURNKEY BASIS). |
|
DISMANTLING, TRANSPORTATION, LIFTING OF CORE, REPAIRING,ASSEMBLING, RE-TRANSPORTATION, RE-INSTALLATION ON EXISTINGBASE, CONNECTION WITH EXISTING SWITCHGEARS, TESTING AND COMMISSIONING OF ONE 4MVA 33KV/6.6KV TRANSFORMER WITH ITS ACCESSORIES INSTALLED AT GEONKHALI NEW WATER TREATMENTPLANT (ON TURN-KEY BASIS).(NIT-29) |
|