Urgent work of construction of Dias covered at top with backdrop, water proof temporary pandel, supply of table, chair, VIP table & chair, flower decoration, sound system and lighting system with Generator etc near Radhaballabpur Bridge for inauguration of LED Street Lighting at evening.(NIQ-11) |
|
Construction of concrete road from Kandapasra to Sripur (Phase-II) under Nandigram-I Block. (NIT-14) |
|
Roof treatment and allied repairing work at Haldia Bhawan. (NIT-15) |
|
URGENT REPAIRING, OVERHAULING AND PAINTING OF PUMPS (INCLUDING SUPPLY OF SPARES) AT DIFFERENT STRATEGIC LOCATIONS UNDER HALDIA WATER SUPPLY PROJECT.(NIT-8 2nd call) |
|
Annual Operation, Surveillance, Maintenance Against Defect & Lost/Damage,etc of all electrical installation & decorative illumination system at Gateway of Haldia, Nandkumar Rotary (except high mast lighting system, Fountain and Pumps) and high mast lighting system at Radhamoni & Nimtouri more on NH-41 (Turnkey basis).(NIT-15) |
|
BEAUTIFICATION OF THE CHILDREN PARK AND MAINTENANCE OF THE SAME ALONG WITH SWEEPING & CLEANING OF THE BATHROOM, OPERATION & MAINTENANCE OF PUMP AND PAY AND USE TOILET WITHIN THE PARK AT DURGACHAK, HALDIA(NIT-4 2nd call) |
|
Repairing of road from Krishnaganj Bazar to Saira Football Ground under Sahid Matangini Block.(NIT-12) |
|
Renovation of conference hall at Haldia Bhawan.(NIT-11) |
|
Notice on NIT-9 |
|
Repairing of Block No. B/2- 6 of ground floor at Swathi Housing Complex.(NIQ-2 2nd call) |
|